So I've been working on this 23.976fps project and couldn't quite figure out what was going on with the sync. It was kind of in sync, but not quite. And not always. After a lot of head scratching it appears that everything was shot on film at 24fps, however the picture editor imported the footage as 23.976fps and synced up all audio to that. The result of this is that all audio is slightly but noticeably drifting within the duration of each clip.
Now that I've found the problem, I am trying to figure out how to batch pull-down all my audio. Do you think this would work? I suspect Pro Tools will get confused if suddenly all audio durations change. I could do it clip by clip, but then I'd be losing my handles.
What a b****y mess!
Has anybody been in this situation and is there a solution? Am I doomed?
Now that I've found the problem, I am trying to figure out how to batch pull-down all my audio. Do you think this would work? I suspect Pro Tools will get confused if suddenly all audio durations change. I could do it clip by clip, but then I'd be losing my handles.
What a b****y mess!
Has anybody been in this situation and is there a solution? Am I doomed?